Home  /  Racing Games  / Wheelie Life 2 on Windows Pc

Wheelie Life 2 on Windows Pc

Developed By: ak.dev

License: FREE

Rating: 4.4/5 - 10709 votes

Last Updated: 2024-10-01

Sponsored Links

Game Details

Version 3.4
Size Vwd
Release Date Nov 21, 2022
Category Racing Games

What's New:
Fixed ... [see more]

Description:
Finding the right balance for doing a wheelie for a long ... [read more]

Permissions:
View details [see more ]

Data safety:
Safety starts with understanding how developers collect and share your data. [see more ]

QR-Code link:
[see more ]

Trusted App:
[see more ]


Compatible with Windows 7/8/10 Pc & Laptop

Download on PC

Compatible with Android

Download on Android

See older versions

App preview ([see all 5 screenshots])

App preview

Looking for a way to Download Wheelie Life 2 for Windows 10/8/7 PC? You are in the correct place then. Keep reading this article to get to know how you can Download and Install one of the best Racing Game Wheelie Life 2 for PC.

Most of the apps available on Google play store or iOS Appstore are made exclusively for mobile platforms. But do you know you can still use any of your favorite Android or iOS apps on your laptop even if the official version for PC platform not available? Yes, they do exits a few simple tricks you can use to install Android apps on Windows machine and use them as you use on Android smartphones.

Here in this article, we will list down different ways to Download Wheelie Life 2 on PC in a step by step guide. So before jumping into it, let’s see the technical specifications of Wheelie Life 2.

Wheelie Life 2 for PC – Technical Specifications

NameWheelie Life 2
Installations5,000,000+
Developed Byak.dev

Wheelie Life 2 is on the top of the list of Racing category apps on Google Playstore. It has got really good rating points and reviews. Currently, Wheelie Life 2 for Windows has got over 5,000,000+ Game installations and 4.4 star average user aggregate rating points.

Wheelie Life 2 Download for PC Windows 10/8/7 Laptop:

Most of the apps these days are developed only for the mobile platform. Games and apps like PUBG, Subway surfers, Snapseed, Beauty Plus, etc. are available for Android and iOS platforms only. But Android emulators allow us to use all these apps on PC as well.

So even if the official version of Wheelie Life 2 for PC not available, you can still use it with the help of Emulators. Here in this article, we are gonna present to you two of the popular Android emulators to use Wheelie Life 2 on PC.

Wheelie Life 2 Download for PC Windows 10/8/7 – Method 1:

Bluestacks is one of the coolest and widely used Emulator to run Android applications on your Windows PC. Bluestacks software is even available for Mac OS as well. We are going to use Bluestacks in this method to Download and Install Wheelie Life 2 for PC Windows 10/8/7 Laptop. Let’s start our step by step installation guide.

  • Step 1: Download the Bluestacks 5 software from the below link, if you haven’t installed it earlier – Download Bluestacks for PC
  • Step 2: Installation procedure is quite simple and straight-forward. After successful installation, open Bluestacks emulator.
  • Step 3: It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  • Step 4: Google play store comes pre-installed in Bluestacks. On the home screen, find Playstore and double click on the icon to open it.
  • Step 5: Now search for the Game you want to install on your PC. In our case search for Wheelie Life 2 to install on PC.
  • Step 6: Once you click on the Install button, Wheelie Life 2 will be installed automatically on Bluestacks. You can find the Game under list of installed apps in Bluestacks.

Now you can just double click on the Game icon in bluestacks and start using Wheelie Life 2 Game on your laptop. You can use the Game the same way you use it on your Android or iOS smartphones.

If you have an APK file, then there is an option in Bluestacks to Import APK file. You don’t need to go to Google Playstore and install the game. However, using the standard method to Install any android applications is recommended.

The latest version of Bluestacks comes with a lot of stunning features. Bluestacks4 is literally 6X faster than the Samsung Galaxy J7 smartphone. So using Bluestacks is the recommended way to install Wheelie Life 2 on PC. You need to have a minimum configuration PC to use Bluestacks. Otherwise, you may face loading issues while playing high-end games like PUBG

Wheelie Life 2 Download for PC Windows 10/8/7 – Method 2:

Yet another popular Android emulator which is gaining a lot of attention in recent times is MEmu play. It is super flexible, fast and exclusively designed for gaming purposes. Now we will see how to Download Wheelie Life 2 for PC Windows 10 or 8 or 7 laptop using MemuPlay.

  • Step 1: Download and Install MemuPlay on your PC. Here is the Download link for you – Memu Play Website. Open the official website and download the software.
  • Step 2: Once the emulator is installed, just open it and find Google Playstore Game icon on the home screen of Memuplay. Just double tap on that to open.
  • Step 3: Now search for Wheelie Life 2 Game on Google playstore. Find the official Game from ak.dev developer and click on the Install button.
  • Step 4: Upon successful installation, you can find Wheelie Life 2 on the home screen of MEmu Play.

MemuPlay is simple and easy to use application. It is very lightweight compared to Bluestacks. As it is designed for Gaming purposes, you can play high-end games like PUBG, Mini Militia, Temple Run, etc.

Wheelie Life 2 for PC – Conclusion:

Wheelie Life 2 has got enormous popularity with it’s simple yet effective interface. We have listed down two of the best methods to Install Wheelie Life 2 on PC Windows laptop. Both the mentioned emulators are popular to use Apps on PC. You can follow any of these methods to get Wheelie Life 2 for Windows 10 PC.

We are concluding this article on Wheelie Life 2 Download for PC with this. If you have any queries or facing any issues while installing Emulators or Wheelie Life 2 for Windows, do let us know through comments. We will be glad to help you out!

We are always ready to guide you to run Wheelie Life 2 on your pc, if you encounter an error, please enter the information below to send notifications and wait for the earliest response from us.

Email:

Message:


Fixed some bugs.
Showing permissions for all versions of this app

    This app has access to:

  • Other
  • full network access.
    view network connections.
The developer has provided this information about how this app collects, shares, and handles your data
  • Data shared
  • - No data shared with third parties
    - The developer says this app doesn't share user data with other companies or organizations.
  • Data collected
  • - The developer says this app doesn’t collect user data
  • Security practices
  • - Data is encrypted in transit
      + Your data is transferred over a secure connection
    - Data can’t be deleted
      + The developer doesn’t provide a way for you to request that your data be deleted
  • For more information about collected and shared data, see the privacy policy:
  • - https://www.akdev.games/privacy-policy
Safe to Download

Napkforpc.com and the download link of this app are 100% safe. All download links of apps listed on Napkforpc.com are from Google Play Store or submitted by users. For the app from Google Play Store, Napkforpc.com won't modify it in any way. For the app submitted by users, Napkforpc.com will verify its APK signature safety before release it on our website.

Finding the right balance for doing a wheelie for a long distance is the challenge.
Perform the greatest wheelies on bikes and do amazing stunts to impress your friends!

Game Features:
- Real physics.
- Different bike paints.
- Online mode.
- Freestyle mode.
- Easy to control.
- Do wheelies and incredible tricks.