Home  /  Lifestyle Apps  / Omega Linkr on Windows Pc

Omega Linkr on Windows Pc

Developed By: Omega Research & Development Technologies, Inc.

License: FREE

Rating: 3.1/5 - 36 votes

Last Updated: 2019-05-21

Sponsored Links

App Details

Version 2.71.0
Size Vwd
Release Date Sep 11, 2015
Category Lifestyle Apps

What's New:
Fixed ... [see more]

Description:
Linkr allows you to start, lock, unlock, activate trunk release, ... [read more]

Permissions:
View details [see more ]

QR-Code link:
[see more ]

Trusted App:
[see more ]


Compatible with Windows 7/8/10 Pc & Laptop

Download on PC

Compatible with Android

Download on Android

See older versions

App preview ([see all 7 screenshots])

App preview

Looking for a way to Download Omega Linkr for Windows 10/8/7 PC? You are in the correct place then. Keep reading this article to get to know how you can Download and Install one of the best Lifestyle App Omega Linkr for PC.

Most of the apps available on Google play store or iOS Appstore are made exclusively for mobile platforms. But do you know you can still use any of your favorite Android or iOS apps on your laptop even if the official version for PC platform not available? Yes, they do exits a few simple tricks you can use to install Android apps on Windows machine and use them as you use on Android smartphones.

Here in this article, we will list down different ways to Download Omega Linkr on PC in a step by step guide. So before jumping into it, let’s see the technical specifications of Omega Linkr.

Omega Linkr for PC – Technical Specifications

NameOmega Linkr
Installations10,000+
Developed ByOmega Research & Development Technologies, Inc.

Omega Linkr is on the top of the list of Lifestyle category apps on Google Playstore. It has got really good rating points and reviews. Currently, Omega Linkr for Windows has got over 10,000+ App installations and 3.1 star average user aggregate rating points.

Omega Linkr Download for PC Windows 10/8/7 Laptop:

Most of the apps these days are developed only for the mobile platform. Games and apps like PUBG, Subway surfers, Snapseed, Beauty Plus, etc. are available for Android and iOS platforms only. But Android emulators allow us to use all these apps on PC as well.

So even if the official version of Omega Linkr for PC not available, you can still use it with the help of Emulators. Here in this article, we are gonna present to you two of the popular Android emulators to use Omega Linkr on PC.

Omega Linkr Download for PC Windows 10/8/7 – Method 1:

Bluestacks is one of the coolest and widely used Emulator to run Android applications on your Windows PC. Bluestacks software is even available for Mac OS as well. We are going to use Bluestacks in this method to Download and Install Omega Linkr for PC Windows 10/8/7 Laptop. Let’s start our step by step installation guide.

  • Step 1: Download the Bluestacks 5 software from the below link, if you haven’t installed it earlier – Download Bluestacks for PC
  • Step 2: Installation procedure is quite simple and straight-forward. After successful installation, open Bluestacks emulator.
  • Step 3: It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  • Step 4: Google play store comes pre-installed in Bluestacks. On the home screen, find Playstore and double click on the icon to open it.
  • Step 5: Now search for the App you want to install on your PC. In our case search for Omega Linkr to install on PC.
  • Step 6: Once you click on the Install button, Omega Linkr will be installed automatically on Bluestacks. You can find the App under list of installed apps in Bluestacks.

Now you can just double click on the App icon in bluestacks and start using Omega Linkr App on your laptop. You can use the App the same way you use it on your Android or iOS smartphones.

If you have an APK file, then there is an option in Bluestacks to Import APK file. You don’t need to go to Google Playstore and install the game. However, using the standard method to Install any android applications is recommended.

The latest version of Bluestacks comes with a lot of stunning features. Bluestacks4 is literally 6X faster than the Samsung Galaxy J7 smartphone. So using Bluestacks is the recommended way to install Omega Linkr on PC. You need to have a minimum configuration PC to use Bluestacks. Otherwise, you may face loading issues while playing high-end games like PUBG

Omega Linkr Download for PC Windows 10/8/7 – Method 2:

Yet another popular Android emulator which is gaining a lot of attention in recent times is MEmu play. It is super flexible, fast and exclusively designed for gaming purposes. Now we will see how to Download Omega Linkr for PC Windows 10 or 8 or 7 laptop using MemuPlay.

  • Step 1: Download and Install MemuPlay on your PC. Here is the Download link for you – Memu Play Website. Open the official website and download the software.
  • Step 2: Once the emulator is installed, just open it and find Google Playstore App icon on the home screen of Memuplay. Just double tap on that to open.
  • Step 3: Now search for Omega Linkr App on Google playstore. Find the official App from Omega Research & Development Technologies, Inc. developer and click on the Install button.
  • Step 4: Upon successful installation, you can find Omega Linkr on the home screen of MEmu Play.

MemuPlay is simple and easy to use application. It is very lightweight compared to Bluestacks. As it is designed for Gaming purposes, you can play high-end games like PUBG, Mini Militia, Temple Run, etc.

Omega Linkr for PC – Conclusion:

Omega Linkr has got enormous popularity with it’s simple yet effective interface. We have listed down two of the best methods to Install Omega Linkr on PC Windows laptop. Both the mentioned emulators are popular to use Apps on PC. You can follow any of these methods to get Omega Linkr for Windows 10 PC.

We are concluding this article on Omega Linkr Download for PC with this. If you have any queries or facing any issues while installing Emulators or Omega Linkr for Windows, do let us know through comments. We will be glad to help you out!

We are always ready to guide you to run Omega Linkr on your pc, if you encounter an error, please enter the information below to send notifications and wait for the earliest response from us.

Email:

Message:


Fixed issue with SMS command when app is force closed.
Showing permissions for all versions of this app

    This app has access to:

  • Location
  • precise location (GPS and network-based).
  • Photos/Media/Files
  • modify or delete the contents of your USB storage.
    read the contents of your USB storage.
  • Contacts
  • modify your contacts.
    read your contacts.
  • Storage
  • modify or delete the contents of your USB storage.
    read the contents of your USB storage.
  • Other
  • control vibration.
    full network access.
    prevent device from sleeping.
    view network connections.
  • Uncategorized
  • receive data from Internet.
Safe to Download

Napkforpc.com and the download link of this app are 100% safe. All download links of apps listed on Napkforpc.com are from Google Play Store or submitted by users. For the app from Google Play Store, Napkforpc.com won't modify it in any way. For the app submitted by users, Napkforpc.com will verify its APK signature safety before release it on our website.

Linkr allows you to start, lock, unlock, activate trunk release, track, and more directly from your phone!

NOTE: An Omega Linkr system must be installed in your vehicle for this app to operate.
NOTE: Locations are sent by SMS message with a link to Google Maps.

Models:
LINKR-MOBILE-2G is an international (outside the USA) system that works on any GSM cellular network with a user supplied SIM card.
LINKR-M1 uses the Verizon network in the USA. Activations & subscriptions are available at www.OmegaLinkr.com.

Omega Linkr is a smartphone interface that gives you control of vehicle convenience & security features from virtually anywhere in the world! This app can directly control Omega's Excalibur line of remote start/security systems & Omegalink vehicle specific remote start kits. It can also be hardwired directly to the vehicle.

Omega Linkr allows you to safely and securely remote start, lock / unlock, or open your car's trunk from virtually anywhere in the world.
Receive alerts and notifications if your vehicle is violated when installed with any compatible remote start / security system.

Main Features:
- Multi-user support
- Multi-device support
- Easy swipe between devices
- 6 languages supported: English, Spanish, French, Malay, Romanian, Serbian
- Heartbeat / Auto-track from once per 1-30 days
- Excessive speed alert w/ selectable threshold
- Low car battery alert
- 2 selectable Geo-fences w/ alerts
- Selectable device icon
- Selectable control screen skin
- Panic from button in car or from app
- Check SIM balance (outside the USA only)
- Eaves drop feature allows you to listen to the vehicle's interior (outside USA only).
Optional LINKR-MIC required.
- Lock control
- Unlock control
- Trunk release
- Start / Stop Engine (optional remote start system required)
- 2 Auxiliary functions
- Dedicated starter disable function
- Assign up to 5 alert receivers