Home  /  Productivity Apps  / Jenny One Pos 餐飲系統 on Windows Pc

Jenny One Pos 餐飲系統 on Windows Pc

Developed By: CITRUS SOLUTIONS CO., LTD

License: FREE

Rating: 4.8/5 - 11 votes

Last Updated: March 27, 2020

Sponsored Links

App Details

Version 3.3
Size 31M
Release Date March 27, 2020
Category Productivity Apps

Description:
**使用平板可以達到最佳使用效果**Jenny One ... [read more]


Compatible with Windows 7/8/10 Pc & Laptop/ Mac

Download on PC

Compatible with Android

Download on Android

See older versions

App preview ([see all 18 screenshots])

App preview

Looking for a way to Download Jenny One Pos 餐飲系統 for Windows 10/8/7 PC? You are in the correct place then. Keep reading this article to get to know how you can Download and Install one of the best Productivity App Jenny One Pos 餐飲系統 for PC.

Most of the apps available on Google play store or iOS Appstore are made exclusively for mobile platforms. But do you know you can still use any of your favorite Android or iOS apps on your laptop even if the official version for PC platform not available? Yes, they do exits a few simple tricks you can use to install Android apps on Windows machine and use them as you use on Android smartphones.

Here in this article, we will list down different ways to Download Jenny One Pos 餐飲系統 on PC in a step by step guide. So before jumping into it, let’s see the technical specifications of Jenny One Pos 餐飲系統.

Jenny One Pos 餐飲系統 for PC – Technical Specifications

NameJenny One Pos 餐飲系統
Installations100+
Developed ByCITRUS SOLUTIONS CO., LTD

Jenny One Pos 餐飲系統 is on the top of the list of Productivity category apps on Google Playstore. It has got really good rating points and reviews. Currently, Jenny One Pos 餐飲系統 for Windows has got over 100+ App installations and 4.8 star average user aggregate rating points.

Jenny One Pos 餐飲系統 Download for PC Windows 10/8/7 Laptop:

Most of the apps these days are developed only for the mobile platform. Games and apps like PUBG, Subway surfers, Snapseed, Beauty Plus, etc. are available for Android and iOS platforms only. But Android emulators allow us to use all these apps on PC as well.

So even if the official version of Jenny One Pos 餐飲系統 for PC not available, you can still use it with the help of Emulators. Here in this article, we are gonna present to you two of the popular Android emulators to use Jenny One Pos 餐飲系統 on PC.

Jenny One Pos 餐飲系統 Download for PC Windows 10/8/7 – Method 1:

Bluestacks is one of the coolest and widely used Emulator to run Android applications on your Windows PC. Bluestacks software is even available for Mac OS as well. We are going to use Bluestacks in this method to Download and Install Jenny One Pos 餐飲系統 for PC Windows 10/8/7 Laptop. Let’s start our step by step installation guide.

  • Step 1: Download the Bluestacks software from the below link, if you haven’t installed it earlier – Download Bluestacks for PC
  • Step 2: Installation procedure is quite simple and straight-forward. After successful installation, open Bluestacks emulator.
  • Step 3: It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  • Step 4: Google play store comes pre-installed in Bluestacks. On the home screen, find Playstore and double click on the icon to open it.
  • Step 5: Now search for the App you want to install on your PC. In our case search for Jenny One Pos 餐飲系統 to install on PC.
  • Step 6: Once you click on the Install button, Jenny One Pos 餐飲系統 will be installed automatically on Bluestacks. You can find the App under list of installed apps in Bluestacks.

Now you can just double click on the App icon in bluestacks and start using Jenny One Pos 餐飲系統 App on your laptop. You can use the App the same way you use it on your Android or iOS smartphones.

If you have an APK file, then there is an option in Bluestacks to Import APK file. You don’t need to go to Google Playstore and install the game. However, using the standard method to Install any android applications is recommended.

The latest version of Bluestacks comes with a lot of stunning features. Bluestacks4 is literally 6X faster than the Samsung Galaxy J7 smartphone. So using Bluestacks is the recommended way to install Jenny One Pos 餐飲系統 on PC. You need to have a minimum configuration PC to use Bluestacks. Otherwise, you may face loading issues while playing high-end games like PUBG

Jenny One Pos 餐飲系統 Download for PC Windows 10/8/7 – Method 2:

Yet another popular Android emulator which is gaining a lot of attention in recent times is MEmu play. It is super flexible, fast and exclusively designed for gaming purposes. Now we will see how to Download Jenny One Pos 餐飲系統 for PC Windows 10 or 8 or 7 laptop using MemuPlay.

  • Step 1: Download and Install MemuPlay on your PC. Here is the Download link for you – Memu Play Website. Open the official website and download the software.
  • Step 2: Once the emulator is installed, just open it and find Google Playstore App icon on the home screen of Memuplay. Just double tap on that to open.
  • Step 3: Now search for Jenny One Pos 餐飲系統 App on Google playstore. Find the official App from CITRUS SOLUTIONS CO., LTD developer and click on the Install button.
  • Step 4: Upon successful installation, you can find Jenny One Pos 餐飲系統 on the home screen of MEmu Play.

MemuPlay is simple and easy to use application. It is very lightweight compared to Bluestacks. As it is designed for Gaming purposes, you can play high-end games like PUBG, Mini Militia, Temple Run, etc.

Jenny One Pos 餐飲系統 for PC – Conclusion:

Jenny One Pos 餐飲系統 has got enormous popularity with it’s simple yet effective interface. We have listed down two of the best methods to Install Jenny One Pos 餐飲系統 on PC Windows laptop. Both the mentioned emulators are popular to use Apps on PC. You can follow any of these methods to get Jenny One Pos 餐飲系統 for Windows 10 PC.

We are concluding this article on Jenny One Pos 餐飲系統 Download for PC with this. If you have any queries or facing any issues while installing Emulators or Jenny One Pos 餐飲系統 for Windows, do let us know through comments. We will be glad to help you out!

**使用平板可以達到最佳使用效果**
Jenny One 使用者手冊連結
http://www.citrus.tw/download/jennyone-TW.pdf
http://www.citrus.tw/download/jennyone-EN.pdf

無需網路的Jenny One

1.可選擇餐桌模式與外帶模式
2.點單結帳不需連網
3.圖形化的即時報表清晰易懂,想看就看不需連網
4.設定菜單直接平板操作,無需後台
5.下載後簡易設定即可使用

Jenny One
餐飲系統可支援USB及網路印表機,錢箱。適用於中小型餐飲行業。專為小吃店、快餐店、西餐廳、早午餐等各式各樣餐廳而設計。

將所有資料都儲存在手機或平板,不用伺服器,不需連接網路。

也可開立電子發票,不需另外買發票機,不需多餘的軟硬體花費。

Jenny One 功能簡介:

訂單管理
外帶、內用、已結單及未結單清楚分類方便管理

店面模式設定
店家可依需求選擇外帶或餐桌模式,自行設置樓層及桌號。

菜單設定
菜單自行設定操作簡單可隨時更新,套餐、尺寸、調味、加料設定應有盡有。

換桌、拆單、併單
拆單、分單操作簡單,換桌併單只需拖曳的方式即可完成,方便快速,隨時為客人處理各種需求。

全單折扣或單品折扣
可選擇全單或單品折扣,還可自行輸入折數或折扣金額

即時報表
圖形化又即時的營業額報表、商品排行及時段分析清晰易懂,讓店家輕鬆掌握銷售狀況。

國際化的需求
可依照國家設定不同的服務費、稅籍、進位規則

目前還提供7天的免費試用期, 7天後只要買正式的授權碼, 即可繼續使用

Jenny One POS
Jenny One is a simple, well-functioning Android POS tablet ordering system.

Standard Edition-
You don't need to use server management.
There is no need to connect to the Internet.
You can add or modify menu at any time with Jenny One.

Features-
1. Set the floor and table, or the fast food take-away mode according to the store's needs.
2. The editing menu is easy to operate and can be used anytime.
3. Size, flavor, and feeding settings are all available, and the complex flavor group is fine.
4. Different types of combo settings are available, and ordering is more efficient.
5. Service fees, taxation, and carrying can all be set up according to different countries.
6. Support a variety of discount methods according to store needs.
7. Support a variety of printer interface. (e.g. USB, Wi-Fi)
8. Support multiple printers: kitchen slip, check and sticker, all can set different printers.
9. Switching tables, void orders and void items is quick and easy.
10. View reports anytime, hourly analysis, and the chart is clear at a glance.
11. Simple operation to view sales report at various time periods and enhance competitiveness.
12. Print the shift report at any time, efficient to calculate the revenue and presented clearly.

You can contact us for more details.