Home  /  Tools Apps  / 10th 12th Board Results 2022 on Windows Pc

10th 12th Board Results 2022 on Windows Pc

Developed By: RS Technologees

License: FREE

Rating: 0/5 - 0 votes

Last Updated: 2023-05-11

Sponsored Links

App Details

Version 1.0.2
Size Vwd
Release Date Mar 23, 2022
Category Tools Apps

Description:
Get All Boards 10th & 12th Result 2022. This app provides ... [read more]

Permissions:
View details [see more ]

QR-Code link:
[see more ]

Trusted App:
[see more ]


Compatible with Windows 7/8/10 Pc & Laptop

Download on PC

Compatible with Android

Download on Android

See older versions

App preview ([see all 24 screenshots])

App preview

Looking for a way to Download 10th 12th Board Results 2022 for Windows 10/8/7 PC? You are in the correct place then. Keep reading this article to get to know how you can Download and Install one of the best Tools App 10th 12th Board Results 2022 for PC.

Most of the apps available on Google play store or iOS Appstore are made exclusively for mobile platforms. But do you know you can still use any of your favorite Android or iOS apps on your laptop even if the official version for PC platform not available? Yes, they do exits a few simple tricks you can use to install Android apps on Windows machine and use them as you use on Android smartphones.

Here in this article, we will list down different ways to Download 10th 12th Board Results 2022 on PC in a step by step guide. So before jumping into it, let’s see the technical specifications of 10th 12th Board Results 2022.

10th 12th Board Results 2022 for PC – Technical Specifications

Name10th 12th Board Results 2022
Installations1,000+
Developed ByRS Technologees

10th 12th Board Results 2022 is on the top of the list of Tools category apps on Google Playstore. It has got really good rating points and reviews. Currently, 10th 12th Board Results 2022 for Windows has got over 1,000+ App installations and 0 star average user aggregate rating points.

10th 12th Board Results 2022 Download for PC Windows 10/8/7 Laptop:

Most of the apps these days are developed only for the mobile platform. Games and apps like PUBG, Subway surfers, Snapseed, Beauty Plus, etc. are available for Android and iOS platforms only. But Android emulators allow us to use all these apps on PC as well.

So even if the official version of 10th 12th Board Results 2022 for PC not available, you can still use it with the help of Emulators. Here in this article, we are gonna present to you two of the popular Android emulators to use 10th 12th Board Results 2022 on PC.

10th 12th Board Results 2022 Download for PC Windows 10/8/7 – Method 1:

Bluestacks is one of the coolest and widely used Emulator to run Android applications on your Windows PC. Bluestacks software is even available for Mac OS as well. We are going to use Bluestacks in this method to Download and Install 10th 12th Board Results 2022 for PC Windows 10/8/7 Laptop. Let’s start our step by step installation guide.

  • Step 1: Download the Bluestacks 5 software from the below link, if you haven’t installed it earlier – Download Bluestacks for PC
  • Step 2: Installation procedure is quite simple and straight-forward. After successful installation, open Bluestacks emulator.
  • Step 3: It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  • Step 4: Google play store comes pre-installed in Bluestacks. On the home screen, find Playstore and double click on the icon to open it.
  • Step 5: Now search for the App you want to install on your PC. In our case search for 10th 12th Board Results 2022 to install on PC.
  • Step 6: Once you click on the Install button, 10th 12th Board Results 2022 will be installed automatically on Bluestacks. You can find the App under list of installed apps in Bluestacks.

Now you can just double click on the App icon in bluestacks and start using 10th 12th Board Results 2022 App on your laptop. You can use the App the same way you use it on your Android or iOS smartphones.

If you have an APK file, then there is an option in Bluestacks to Import APK file. You don’t need to go to Google Playstore and install the game. However, using the standard method to Install any android applications is recommended.

The latest version of Bluestacks comes with a lot of stunning features. Bluestacks4 is literally 6X faster than the Samsung Galaxy J7 smartphone. So using Bluestacks is the recommended way to install 10th 12th Board Results 2022 on PC. You need to have a minimum configuration PC to use Bluestacks. Otherwise, you may face loading issues while playing high-end games like PUBG

10th 12th Board Results 2022 Download for PC Windows 10/8/7 – Method 2:

Yet another popular Android emulator which is gaining a lot of attention in recent times is MEmu play. It is super flexible, fast and exclusively designed for gaming purposes. Now we will see how to Download 10th 12th Board Results 2022 for PC Windows 10 or 8 or 7 laptop using MemuPlay.

  • Step 1: Download and Install MemuPlay on your PC. Here is the Download link for you – Memu Play Website. Open the official website and download the software.
  • Step 2: Once the emulator is installed, just open it and find Google Playstore App icon on the home screen of Memuplay. Just double tap on that to open.
  • Step 3: Now search for 10th 12th Board Results 2022 App on Google playstore. Find the official App from RS Technologees developer and click on the Install button.
  • Step 4: Upon successful installation, you can find 10th 12th Board Results 2022 on the home screen of MEmu Play.

MemuPlay is simple and easy to use application. It is very lightweight compared to Bluestacks. As it is designed for Gaming purposes, you can play high-end games like PUBG, Mini Militia, Temple Run, etc.

10th 12th Board Results 2022 for PC – Conclusion:

10th 12th Board Results 2022 has got enormous popularity with it’s simple yet effective interface. We have listed down two of the best methods to Install 10th 12th Board Results 2022 on PC Windows laptop. Both the mentioned emulators are popular to use Apps on PC. You can follow any of these methods to get 10th 12th Board Results 2022 for Windows 10 PC.

We are concluding this article on 10th 12th Board Results 2022 Download for PC with this. If you have any queries or facing any issues while installing Emulators or 10th 12th Board Results 2022 for Windows, do let us know through comments. We will be glad to help you out!

We are always ready to guide you to run 10th 12th Board Results 2022 on your pc, if you encounter an error, please enter the information below to send notifications and wait for the earliest response from us.

Email:

Message:


Showing permissions for all versions of this app

    This app has access to:

  • Phone
  • read phone status and identity.
  • Photos/Media/Files
  • modify or delete the contents of your USB storage.
    read the contents of your USB storage.
  • Storage
  • modify or delete the contents of your USB storage.
    read the contents of your USB storage.
  • Camera
  • take pictures and videos.
  • Wi-Fi connection information
  • view Wi-Fi connections.
  • Device ID & call information
  • read phone status and identity.
  • Other
  • control vibration.
    full network access.
    prevent device from sleeping.
    run at startup.
    view network connections.
  • Uncategorized
  • receive data from Internet.
Safe to Download

Napkforpc.com and the download link of this app are 100% safe. All download links of apps listed on Napkforpc.com are from Google Play Store or submitted by users. For the app from Google Play Store, Napkforpc.com won't modify it in any way. For the app submitted by users, Napkforpc.com will verify its APK signature safety before release it on our website.

Get All Boards 10th & 12th Result 2022. This app provides you fastest way to check your Result. App also provides you information when Result is going to Declared. This App having the latest updates of all board exams along with previous years results statics so that you can easily estimate expected date and percentage.

Features

★ 10th Result of All Indian Boards
★ 12th Result of All Indian Boards
★ 11th, 8th & 5th Result
★ 10th & 12th Sample Paper/Model Paper
★ 10th & 12th Solved Previous Year Paper
★ Open Schooling Result and Time Table
★ Compartment Exam Result and Time Table
★ State Boards Books and Study Material
★ Share your result in PDF format by just clicking on PDF icon
★ Share your result as Image
★ Get Notification of Your Result
★ Fastest Result Response
★ Zoom in , Zoom Out features

10th Board Result 2022: All board which conducted 10th class exam as following

➡️ CBSE 10th Result 2022
➡️ Rajasthan Board 10th Result 2022
➡️ UP Board 10th Result 2022
➡️ MP Board 10th Result 2022
➡️ BSEB 10th Result 2022
➡️ Orissa 10th result 2022
➡️ JKBOSE 10th Result 2022
➡️ HPBOSE 10th Result 2022
➡️ HBSE 10th Result 2022
➡️ ICSE 10th Result 2022
➡️ CGBSE 10th Result 2022
➡️ PSEB 10th Result 2022


12th Board Results 2022: All board which conducted 12th class exam as following

➡️ CBSE 12th result 2022
➡️ MP Board 12th Result 2022
➡️ UP Board 12th Result 2022
➡️ Rajasthan Board 12th Result 2022
➡️ Bihar Board 12th Result 2022
➡️ WB Higher Secondary Result 2022
➡️ Orissa 12th Result 2022
➡️ JKBOSE 12th Result 2022
➡️ HPBOSE 12th Result 2022
➡️ HBSE 12th Result 2022
➡️ ISC Board 12th Result 2022
➡️ CGBSE 12th Result 2022
➡️ PSEB 12th Result 2022

SSC Results 2022: All Board which conducted SSC Board Exams

➡️ AP SSC Results 2022
➡️ Goa Board SSC Result 2022
➡️ GSEB SSC Result 2022
➡️ JAC SSC Results 2022
➡️ JKBOSE SSC Result 2022

SSLC Results 2022: All Board which conducted SSLC Board Exams

➡️ Kerala SSLC Result 2022
➡️ Karnataka SSLC Result 2022
➡️ TN SSLC Result 2022
➡️ Mizoram HSLC Result 2022
➡️ Manipur HSLC Result 2022
➡️ Tripura Madhyamik Result 2022

HSC/ Intermediate Result 2022: All Board which conducted HSC/Intermediate Board exam Result

➡️ Kerala HSE Result 2022
➡️ Karnataka PUC Result 2022
➡️ TN HSC Result 2022
➡️ Maharashtra HSC Result 2022
➡️ AP Intermediate Results 2022
➡️ WB Higher Secondary Result 2022
➡️ Orissa CHSE Result 2022
➡️ Goa Board HSSC Results 2022
➡️ GSEB HSSC Result 2022
➡️ JAC Inter Result 2022
➡️ Manipur HSE Result 2022
➡️Tripura HSE Result 2022
➡️ Nagaland Board HSC Result 2022
Disclaimer
The App is not an official app of any Government/ Private entity. In the app information presented does not imply any affiliation to or endorsement by any entity. The material is only education purpose. The app is use of services provided by Government/Private entity for public use. The links to websites provided are only for convenience of the user.

For result checking we used official website of state board only for public use

Source Of Information
Various Government Board Websites.