Home  /  Books & Reference Apps  / Maraaqil Ubudiyyah on Windows Pc

Maraaqil Ubudiyyah on Windows Pc

Developed By: Kitab Kuning Digital

License: FREE

Rating: 0/5 - 0 votes

Last Updated: 2024-02-12

Sponsored Links

App Details

Version 1.0
Size Vwd
Release Date Feb 11, 2024
Category Books & Reference Apps

What's New:
Initial ... [see more]

Description:
Maraqil Ubudiyah adalah kitab Syarah Bidaayatul Hidayah karya ... [read more]

Permissions:
View details [see more ]

QR-Code link:
[see more ]

Trusted App:
[see more ]


Compatible with Windows 7/8/10 Pc & Laptop

Download on PC

Compatible with Android

Download on Android

See older versions

App preview ([see all 8 screenshots])

App preview

Looking for a way to Download Maraaqil Ubudiyyah for Windows 10/8/7 PC? You are in the correct place then. Keep reading this article to get to know how you can Download and Install one of the best Books & Reference App Maraaqil Ubudiyyah for PC.

Most of the apps available on Google play store or iOS Appstore are made exclusively for mobile platforms. But do you know you can still use any of your favorite Android or iOS apps on your laptop even if the official version for PC platform not available? Yes, they do exits a few simple tricks you can use to install Android apps on Windows machine and use them as you use on Android smartphones.

Here in this article, we will list down different ways to Download Maraaqil Ubudiyyah on PC in a step by step guide. So before jumping into it, let’s see the technical specifications of Maraaqil Ubudiyyah.

Maraaqil Ubudiyyah for PC – Technical Specifications

NameMaraaqil Ubudiyyah
Installations1+
Developed ByKitab Kuning Digital

Maraaqil Ubudiyyah is on the top of the list of Books & Reference category apps on Google Playstore. It has got really good rating points and reviews. Currently, Maraaqil Ubudiyyah for Windows has got over 1+ App installations and 0 star average user aggregate rating points.

Maraaqil Ubudiyyah Download for PC Windows 10/8/7 Laptop:

Most of the apps these days are developed only for the mobile platform. Games and apps like PUBG, Subway surfers, Snapseed, Beauty Plus, etc. are available for Android and iOS platforms only. But Android emulators allow us to use all these apps on PC as well.

So even if the official version of Maraaqil Ubudiyyah for PC not available, you can still use it with the help of Emulators. Here in this article, we are gonna present to you two of the popular Android emulators to use Maraaqil Ubudiyyah on PC.

Maraaqil Ubudiyyah Download for PC Windows 10/8/7 – Method 1:

Bluestacks is one of the coolest and widely used Emulator to run Android applications on your Windows PC. Bluestacks software is even available for Mac OS as well. We are going to use Bluestacks in this method to Download and Install Maraaqil Ubudiyyah for PC Windows 10/8/7 Laptop. Let’s start our step by step installation guide.

  • Step 1: Download the Bluestacks 5 software from the below link, if you haven’t installed it earlier – Download Bluestacks for PC
  • Step 2: Installation procedure is quite simple and straight-forward. After successful installation, open Bluestacks emulator.
  • Step 3: It may take some time to load the Bluestacks app initially. Once it is opened, you should be able to see the Home screen of Bluestacks.
  • Step 4: Google play store comes pre-installed in Bluestacks. On the home screen, find Playstore and double click on the icon to open it.
  • Step 5: Now search for the App you want to install on your PC. In our case search for Maraaqil Ubudiyyah to install on PC.
  • Step 6: Once you click on the Install button, Maraaqil Ubudiyyah will be installed automatically on Bluestacks. You can find the App under list of installed apps in Bluestacks.

Now you can just double click on the App icon in bluestacks and start using Maraaqil Ubudiyyah App on your laptop. You can use the App the same way you use it on your Android or iOS smartphones.

If you have an APK file, then there is an option in Bluestacks to Import APK file. You don’t need to go to Google Playstore and install the game. However, using the standard method to Install any android applications is recommended.

The latest version of Bluestacks comes with a lot of stunning features. Bluestacks4 is literally 6X faster than the Samsung Galaxy J7 smartphone. So using Bluestacks is the recommended way to install Maraaqil Ubudiyyah on PC. You need to have a minimum configuration PC to use Bluestacks. Otherwise, you may face loading issues while playing high-end games like PUBG

Maraaqil Ubudiyyah Download for PC Windows 10/8/7 – Method 2:

Yet another popular Android emulator which is gaining a lot of attention in recent times is MEmu play. It is super flexible, fast and exclusively designed for gaming purposes. Now we will see how to Download Maraaqil Ubudiyyah for PC Windows 10 or 8 or 7 laptop using MemuPlay.

  • Step 1: Download and Install MemuPlay on your PC. Here is the Download link for you – Memu Play Website. Open the official website and download the software.
  • Step 2: Once the emulator is installed, just open it and find Google Playstore App icon on the home screen of Memuplay. Just double tap on that to open.
  • Step 3: Now search for Maraaqil Ubudiyyah App on Google playstore. Find the official App from Kitab Kuning Digital developer and click on the Install button.
  • Step 4: Upon successful installation, you can find Maraaqil Ubudiyyah on the home screen of MEmu Play.

MemuPlay is simple and easy to use application. It is very lightweight compared to Bluestacks. As it is designed for Gaming purposes, you can play high-end games like PUBG, Mini Militia, Temple Run, etc.

Maraaqil Ubudiyyah for PC – Conclusion:

Maraaqil Ubudiyyah has got enormous popularity with it’s simple yet effective interface. We have listed down two of the best methods to Install Maraaqil Ubudiyyah on PC Windows laptop. Both the mentioned emulators are popular to use Apps on PC. You can follow any of these methods to get Maraaqil Ubudiyyah for Windows 10 PC.

We are concluding this article on Maraaqil Ubudiyyah Download for PC with this. If you have any queries or facing any issues while installing Emulators or Maraaqil Ubudiyyah for Windows, do let us know through comments. We will be glad to help you out!

We are always ready to guide you to run Maraaqil Ubudiyyah on your pc, if you encounter an error, please enter the information below to send notifications and wait for the earliest response from us.

Email:

Message:


Download older versions

2024-02-12: Download Maraaqil Ubudiyyah 1.0 on Windows PC – Vwd

Initial Release Maraaqil Ubudiyyah
Showing permissions for all versions of this app

    This app has access to:

  • Other
  • full network access.
    prevent device from sleeping.
    view network connections.
Safe to Download

Napkforpc.com and the download link of this app are 100% safe. All download links of apps listed on Napkforpc.com are from Google Play Store or submitted by users. For the app from Google Play Store, Napkforpc.com won't modify it in any way. For the app submitted by users, Napkforpc.com will verify its APK signature safety before release it on our website.

Maraqil Ubudiyah adalah kitab Syarah Bidaayatul Hidayah karya Imam Ghazali, berisikan pelajaran terkait akhlaq dan fiqih dari bangun tidur hingga tidur kembali,

Kitab ini biasa dibaca oleh santri-santri di Pondok Pesantren sebagai Ilmu dasar pendamping kajian kitab nahwu dan sharaf.